Resource Efficiency Grant for Emissions (REG(E)): EDB Funding to Cut Industrial Carbon

Industrial pipes and valves in a manufacturing plant

The Resource Efficiency Grant for Emissions, REG(E), is an Economic Development Board (EDB) grant for Singapore-registered companies that own or operate an industrial facility in Singapore and carry out manufacturing or data-centre activities there. It funds projects expected to cut at least 250 tonnes of carbon dioxide equivalent (tCO2e) a year, such as energy efficiency upgrades or reducing non-CO2 greenhouse gases. The grant is based on the carbon abatement achieved, capped at 50% of qualifying costs, and the scheme is open until the end of FY2030.

Industrial pipes and valves in a manufacturing plant
Photo by Ricardo Gomez Angel on Unsplash

REG(E) is aimed at serious engineering projects: chiller plant replacements, process heat recovery, compressed air optimisation, abatement of industrial gases and similar work at factories and data centres. It is paid once, after the project is completed and the carbon savings are verified, so the company must fund the project first. This guide explains the eligibility tests, the measurement and verification (M&V) requirement that drives the application, and how to plan around the one-time payment.

Who is eligible for REG(E)?

EDB’s REG(E) factsheet sets two layers of eligibility.

Test Requirement
Company Registered or incorporated in Singapore
Facility Owner or operator of an industrial facility located in Singapore
Activity Undertaking manufacturing activities or data-centre activities in Singapore
Project location Carried out in that manufacturing or data-centre facility in Singapore
Carbon abatement Projected to deliver measurable and verifiable abatement of at least 250 tCO2e per year

The factsheet does not set a local shareholding requirement, which makes REG(E) relevant to foreign-owned manufacturers and data-centre operators as well as local firms. Offices, retail premises and commercial buildings do not fit the facility test.

What kinds of projects qualify?

EDB gives examples rather than a closed list:

EDB asks companies to consult it on whether a particular project type is eligible, and on the hydrofluorocarbon applications it accepts. Projects involving industrial motors, LED lighting and split-unit air-conditioners have a streamlined M&V process.

Smaller equipment upgrades that will not reach 250 tCO2e a year may suit the Energy Efficiency Grant instead. NEA’s EEG page states that the Base Tier runs to 31 March 2028 and the Advanced Tier to 31 March 2027.

How much funding can you get?

The grant is calculated from a support rate applied to the carbon abatement the project achieves, and is capped at 50% of qualifying costs. EDB does not publish the support rate per tonne in the factsheet, so the actual amount for a project can only be confirmed with EDB.

Qualifying costs can include:

Costs must normally fall within the qualifying period, which can be up to five years. The exception is consultancy incurred up to one year before the qualifying period starts, if it was for setting the energy or emissions baseline, identifying abatement projects or preparing the project proposal.

Example: A Singapore pharmaceutical plant plans to replace its chiller plant and add heat recovery at a cost of S$1.6 million. Engineers estimate abatement of 900 tCO2e a year, well above the 250-tonne threshold. Whatever EDB’s support rate produces, the grant cannot exceed S$800,000 (50% of qualifying costs). The plant pays the full S$1.6 million first and receives the grant in one payment after completion and verification. These figures are illustrative.

Why measurement and verification matters so much

The application turns on the M&V plan. Your project proposal must include technical details and an M&V plan that sets out:

The M&V plan must be endorsed by an independent Qualified Endorser, who must be one of:

Because the grant follows verified abatement, a weak baseline is the most expensive mistake. If the baseline is not measured properly before work begins, the savings cannot be proven later.

How do you apply?

  1. Screen the project. Estimate annual abatement against the 250 tCO2e threshold and check the facility and activity tests.
  2. Consult EDB early. EDB asks companies to discuss project types, other supportable costs and M&V requirements before applying.
  3. Establish the baseline. Measure current energy use or emissions; the consultancy cost for this can qualify if incurred within one year before the qualifying period.
  4. Prepare the project proposal. Include technical details, the M&V plan, cost breakdowns and the timeline.
  5. Obtain Qualified Endorser sign-off on the M&V plan.
  6. Submit and await approval. All applications must receive EDB’s final approval by 31 March 2031.
  7. Implement, verify and claim. On completion, the abatement is verified against the award conditions and the full grant is paid in one disbursement.

Documents checklist

Cash flow, tax and carbon tax points

Since REG(E) pays once at the end, finance teams should plan the full project cost through to verification, which can be some years after approval. The grant may also affect how capital allowances are claimed on the funded equipment; our article on the tax and accounting treatment of grants explains the general rules. Larger emitters should also consider how abatement interacts with their carbon tax obligations, and listed or large companies preparing their first climate report may also qualify for the Sustainability Reporting Grant. For a wider view, see our directory of Singapore government grants for companies.

Common reasons REG(E) projects run into trouble

Frequently asked questions

Is REG(E) an NEA grant?

No. The current Resource Efficiency Grant for Emissions is administered by EDB, as shown on EDB’s incentives and green economy pages.

What is the minimum project size?

The test is carbon, not money: the project must be projected to abate at least 250 tCO2e a year in a measurable and verifiable way.

How long is REG(E) open?

EDB states the scheme is open until the end of FY2030, and all applications must receive final approval by 31 March 2031.

Is the grant paid in stages?

No. EDB pays the full grant in one disbursement after the project is completed and the award conditions are verified.

Can data centres apply?

Yes. Companies undertaking data-centre activities in a Singapore facility they own or operate are within the eligibility criteria.

Official sources: EDB green economy support and the EDB REG(E) factsheet.

Information checked against official sources on 6 November 2026.

Free grant consultation: is REG(E) right for your company?

Raffles Corporate Services has in-house certified grant consultants who are experienced with Singapore grant applications and the full grant process, from checking eligibility and preparing the proposal and supporting documents to submitting claims and meeting the conditions after approval. We can arrange a free consultation to review your company and identify which grants, including REG(E), may be applicable.

Email [email protected] or WhatsApp +65 8501 7133 to book a time. EDB decides every application, and no consultant can guarantee approval.

The Editorial Team, Raffles Corporate Services